Monday, October 31, 2011

New Fabric





The green fabric on the powered retractable awnings have been replaced with smoke sunbrella fabric.

Outdoor Fan

Outdoor fan and qty 2 outdoor speakers installed in the back patio.
Fan:  Minka Aire Concept I
Speakers:  Definitive Technology AW6500

Guest Bedroom Update




Bamboo flooring and ceiling fan installed.
Fan:  Modern Fan Company Lapa Hugger

Office Update



Bamboo flooring and ceiling fan installed.
Fan:  Modern Fan Company Lapa Hugger

Media Room Update

Bamboo flooring and ceiling fan installed.
Fan:  Modern Fan Company Lapa Hugger

More Ceiling Speakers

Qty 2 ceiling speakers in master bedroom...
Speakers:  Bose 191

Ceiling Speakers

Qty 2 ceiling speakers installed in dining room.
Speakers:  Definitive Technology DI 6.5R

TV Ready

Pass & Seymour recessed TV box...now just need to buy the TV...

Sunday, October 30, 2011

Master Bedroom




Master bedroom is painted and we can see our floors again...still a bit of stuff stored in there... that refrigerator will be going to the garage or the office closet...

Ceiling Speakers

Qty 4 ceiling speakers installed in the living room.
Speakers:  Definitive Technology DI 6.5R

Sunday, October 23, 2011

Game Over...

is the name of the paint color...

Bamboo

Bamboo flooring being installed in guest bedroom.

Dog Door #2


2nd dog door installed - this is in the master bedroom.  Didn't like the original location to the right - so that still needs to be patched.

Master Bedroom

Master bedroom is painted and also wired for flat panel TV.

Saturday, October 15, 2011

Guest Bedroom

Old floor is out and room is painted.

Wired

Room is painted and wired for flat panel TV and surround sound.  Next up is the bamboo flooring.

Side Gate


New side gate.  Not a fan of those hinges - those need to be changed for different hardware and the shrubbery right against the house will have to go.

Drywalled

Ready for the rack to be installed.

Kitchen Update

Some of the plumbing lines were replaced, and the HVAC duct was rerouted to ceiling.   Kitchen is now drywalled and painted - ready for cabinets.

Friday, October 7, 2011

The Bar

Recessed lights installed and electrical run - ready for the bar.

BBQ

The BBQ and raised platform were both removed - this area will be filled in with concrete.  The gas, water, and electrical lines will be rerouted by the new garage where at a later date we will have a new BBQ constructed.

HVAC


New slider (well, half of it), window, recessed lights, and HVAC unit installed in office.  Floor has been levelled and is ready for the bamboo flooring.
HVAC unit:  Samsung AQV09NSD

New Window

There was a stained glass window in the master bedroom that didn't really match the house - this was replaced with a standard window.

Wednesday, October 5, 2011

Too Much Glue

 
Whoever installed the hardwood floors in the guest bedroom used way too much adhesive and/or the wrong type.  Unfortunately, this is the only way to remove the flooring.