Saturday, December 24, 2011

AVRAK



The rack is finally installed...

Kitchen Update

All of the cabinet and drawer fronts are in...with the exception of the one pictured...

Office Exterior Lights

Exterior has been stuccoed and painted.  New lights installed as well.
Lights:  Hinkley Luna Outdoor Wall Sconce - Small

WTB a Level


The first upper cabinets they built for the bar were the wrong height - these are the correct cabinets.  They still need to fill in the backsplash tile and purchase a level so they can reinstall the upper cabinets.

Wednesday, December 21, 2011

Monday, December 19, 2011

Progress???

Cabinets for the built in refrigerator have been installed...this is taking waaaaaay too long.

Saturday, December 10, 2011